2026-05-29 21:10 UTC · Trigger: n8n-stage1-consult-scheduled webhook
Stage 1 cannot proceed — three independent blockers prevent autonomous execution. No records were created, no Notion pages were written, no emails were sent. This is a draft-only report of what would happen if the blockers were resolved.
IXJy5q59FfJuY3Ej is active but has zero executions — it was never triggered by a real Notion event. This session was a manual/hermes webhook test.
Scanned the Sales Pipeline data source for all entries at pre-consult stages. Below is every entry that could trigger Stage 1 if it moved to the correct stage with complete fields.
| Student | Lead Owner | Org | Grad Yr | Dashboard | Status |
|---|---|---|---|---|---|
| Jacob Kim | Unset | None | Missing | Non-Senior? (unknown yr) | Can't proceed |
| Lu Yang (child TBD) | Unset | None | Missing | Unknown | No student name |
| Bhalla (Wu referral) | George Mailat ✓ | None | Missing | Unknown | No student name, no org |
| __ Yriarte '27 | George Mailat ✓ | None | '27 (in title only) | Non-Senior | No org |
| Student | Lead Owner | Org | Grad Yr | Notes |
|---|---|---|---|---|
| Gloria Kuang | Unset | None | Missing | Stale (Mar 2026) |
| Akshat Shegal | Jon Kang ✓ | None | Missing | Stale (Feb 2026) |
| Clementine Yu-Burns | Jon Kang ✓ | None | Missing | Stale (Feb 2026) |
| Caden Suh | Jon Kang ✓ | None | Missing | Stale (Feb 2026) |
| Emily's sibling (Kim) | Jon Kang ✓ | None | Missing | Stale; no first name |
| Justin Chen | Jon Kang ✓ | None | Missing | Stale (edited May 2026) |
| Aaron (8th grade) | Jon Kang ✓ | None | Missing | Stale; no family name |
| Murali? | Jon Kang ✓ | None | Missing | Stale; single name only |
| Qirui Zhan referral | Jon Kang ✓ | None | Missing | Stale; no student name |
| Yejin (mom) | Jon Kang ✓ | None | Missing | Stale; no student name |
| Can (Cassie referral) | Jon Kang ✓ | None | Missing | Stale; no student name |
For a hypothetical candidate with complete fields at the correct trigger stage, here is the exact sequence Stage 1 would execute. None of these steps were performed.
Assuming fields are populated + stage renamed + integration has access.
[INITIAL MEETING] StudentName ('YY) → [INITIAL MEETING] Jacob Kim ('28)122ba53a-dfd4-8105-a611-000bce78782e)27fba53a-dfd4-8008-ae6f-000b743e38bb)[INITIAL MEETING] Jacob Kim's Dashboard (v4.0)1XprRUqYRlnjrECivz-mYncpi6HOk4zTXVOC7ABHtktc[INITIAL MEETING] Jacob Kim ('28) — Consult Notes[INITIAL MEETING] projects from Pipeline's Projects relation
jon@telosprep.com · Subject: Consult scheduled — Jacob Kim ('28) — new dashboard readyBefore Stage 1 can run autonomously (or even in a live dry run):
IXJy5q59FfJuY3Ej is active but has never executed. It's configured to fire on a Notion webhook trigger — verify the Notion automation is set up correctly on the Sales Pipeline database, or switch to the polling pattern if Notion automations are unreliable.
4fc121f9-12f4-42ba-adee-96d52495f60e) via the data source query API. This dry run successfully scanned all 232 Pipeline entries. The issue is write access to Projects, Student Dashboards, and Pipeline — all return 404 with the current integration.
IXJy5q59FfJuY3Ej ("Onboarding — Stage 1: Consult Scheduled → Hermes") is active (updated 2026-05-29T21:03:33Z) but has zero executions. The Notion automation that triggers this webhook has either never fired or is not connected. The webhook subscription n8n-stage1-consult-scheduled exists in webhook_subscriptions.json with correct route, HMAC secret, and toolset configuration.
telos-stage1-initial-meeting-prep exists in ~/.hermes/skills/ and loaded without errors. The frontmatter name matches the directory name. Gateway skill index has this skill available.
safe_mode: true — even if all blockers were resolved, the webhook would produce draft-only output. This is correct for now. Graduation to live mode requires Jeremiah's explicit approval.